PV system in Bimbilla, installed Februar 2025
The GfC mission in Bimbilla now has a reliable power supply! A new solar system with a battery has replaced the unreliable grid. Lighting, water and air conditioning all work perfectly now — and best of all, the sun doesn't send a bill!
PV system Radio Builsa, repaired and improved October 2024
The repair of Radio Builsa's solar installation in northern Ghana has made it possible to provide important information in the local languages of Buli, Frafra and Kasem, and we can now monitor energy consumption and battery data via the manufacturer's portal.
Battery for the local radio, installed Octobre 2023
The local radio station needs a battery - at the moment the excess electricity is fed into the grid without being remunerated. With the battery, the electricity can be used by the local radio itself.
PV system Children’s Village Kumasi
redisigned September 2022
We resized the system, replaced the battery and inverter. Now we take care of the maintenance and upkeep.
PV system «Wêndbenedo», installed December 2020
The Kientega family in Bobo Dioulasso has been operating a PV system on their own roof for several years - unfortunately, it does not function properly.
PV system Saleti Guesthouse, installed October 2018
A new guesthouse at the end of a utility line struggles with power outages and voltage problems
PV system Tumu Home Store, installed August 2017
In August 2017, a small solar system was installed at a household store in Tumu as part of the 1st installer course.
PV system Radford FM, installed August 2017
The local radio station "Radford FM" gets a PV system and becomes self-sufficient to a large extent.
PV system SILAP Guesthouse, installed 2015, extend‘ Aug. 2017, repaired Oct. 2023
Solar energy is vital in Ghana’s energy transition, providing a reliable source of power at SILAP Guesthouse since 2015.
Active Systems
PV-System Radford FM, installed August 2017
Localradio «Radford FM» in Tumu, Ghana (UWR)
Trainings given
Installer and designer for batteries, October 2023
A course for installers and designers was held in October 2023. Participants learned how to design PV systems with batteries.
Instructor exam 2, constructor (local trainer), Tumu, March 2021.
Now that the material has been fully taught, the designer courses could be completed. However, travel is currently very difficult because of the political situation in Burkina Faso.
Trainer Exam 1, Installer, Tumu, February 2020
The local team is now to arrange its first PV installer training course itself. We are available to help where necessary... more
Instructor 6, installer (local instructors), Sandema, November 2019.
The local trainers have advertised this course themselves and run it independently. We are only online at the conclusion... more
Instructor 5, Designer 3, Tumu, August 2019
We offer courses so that Africans can build and maintain solar systems themselves. The sun does not charge!
Instructor 4, Designer 2, Tumu, November 2018
Using existing plants, we go through the design process in detail.
Instructor 3, Designer 1, Tumu, August 2018
In order for a solar system to produce the optimum yield, many detailed questions must be clarified, from the correct orientation and mounting of the PV modules to the grid connection.
Instructor 2, maintenance and servicing, Tumu, February 2018
Solar systems are low maintenance - but not maintenance free. Soiling of the PV modules, water level of the lead batteries, deep discharges, technical defects... require specialized personnel for maintenance and servicing.
Installer, Trainer 1, Tumu, August 2017
In August 2017, we started our first training of solar installers course in Ghana. This initiative aimed to educate participants and support sustainable energy solutions.
Planned projects and trainings
New training course „PV designer“
Soon the new course for installers will take place. We help local installers so that they can create their own projects....